bizhub C451i vs. C551i vs. C651i

All three have a 300-sheet duplex feeder rated at up to 280 images per minute. The difference you will feel in a shared print queue is 45, 55 or 65 letter pages per minute. A public proposal priced all three with the same letter tray, stapler and hole punch. The C651i added $1,865.11 over the C451i in that proposal.

Konica Minolta bizhub C651i with feeder and optional finishing equipment
Konica Minolta C651i product photo. Check the equipment list for optional drawers and finishers.

Compare prices with the same tray and finisher

The City of Visalia’s January 2026 proposal specified the PC-416 letter tray, RU-513 relay, FS-539 staple finisher and PK-524 punch on each row below. These are proposed equipment prices with the listed options. Get service and installation terms in writing for your site.

Same accessory list in the Visalia proposal
ModelEquipmentLetter print11 × 17 copy
bizhub C451i$7,954.0945 ppm22.6 sheets/min
bizhub C551i$9,038.4455 ppm27.5 sheets/min
bizhub C651i$9,819.2065 ppm32.6 sheets/min

A 600-side letter run takes about 13:20 at 45 ppm, 10:55 at 55 ppm or 9:14 at 65 ppm at continuous rated speed. Warmup, thick paper, two-sided settings and finishing can affect the time. If you run 11 × 17 all day, ask for that size in your demonstration. The PC-416 adds letter capacity. Ask about the LU-207 or another compatible tray if you need dedicated 11 × 17 or 12 × 18 capacity. Visalia equipment proposal (PDF) · Konica Minolta copy and scan specifications.

What an installed C651i and its service can cost

Boone County purchase
$11,617.25 for a C651i with drawers, booklet finisher, punch, fax, delivery, installation and training. Service was 0.77¢ per black-and-white impression and 4.52¢ per color impression. At 8,000 black-and-white and 2,000 color impressions, that is $152.00 per month in service. January 2026 purchase agreement (PDF).
Jackson rental
$481.00 per month over 48 months for a C651i, a separate Kodak S2060 scanner and options. Meter charges were 0.85¢ black and white and 5.00¢ color. The same example volume adds $168.00 for a total of $649.00 per month. October 2026 council packet (PDF).

The contracts cover different configurations. Ask for the same device and accessories on any purchase and rental quotes you compare. Boone County priced parts, labor, drums, toner and developer in its service rate. Confirm those items, billable paper sizes and the response time at your ZIP.

Test a finished print job and a scan

Bring your largest regular job and ask the seller to run it using the exact tray, paper stock and finisher on the quote. For scanning, feed a mixed batch under a regular staff account. Check page order, search for a known phrase and confirm the approved destination can open the completed file.

For document management, a shared folder can feed a watched-folder capture job in Ademero’s Content Central. Check that the sample reaches the intended catalog or review queue and verify retrieval permissions with two staff accounts. Ademero operates CopierGuide.